/ Chronological Audit

Six Months of Sub-Floor Removal and Ignored Filings

A documented public record of 120+ consecutive days of pneumatic jackhammering, acoustic degradation, and unexplained Department of Buildings complaint closures at The Buchanan.

Phase Breakdown

The 120-Day Acoustic Degradation

Systematic removal of sub-flooring above a rent-stabilized unit without structural dampening.

Months 1-2
Months 3-4
Months 5-6

Pneumatic Jackhammering

Structural Impact Noise

Refusal to Inspect

Continuous extraction of concrete sub-flooring above ceiling joists, stripping out baseline acoustic isolation.

Absence of sub-flooring turns standard footfalls into reverberating structural thunder throughout the apartment.

Management rejects all requests to enter the residence and verify acoustic conditions firsthand.

Paper Trail

Management Silence and Fabrication

01
02
03

Ignored Formal Notices

Baseless Fabrication Claims

Premature DOB Closure

Six months of written emails detailing acoustic degradation met with complete management and legal silence.

Management responds by officially implying that the tenant and overnight witnesses are fabricating the noise.

Active complaint #3918247 mysteriously closed without a single on-site inspection or investigator visit.

Access the Full Evidence Archive

Review raw email headers, audio frequency logs, and unredacted city agency filings.